top of page
IMG_7178.JPEG

LG TRAINING LAB

Sign Up & Pay  Here

ATTENDEES: Engineers, Superintendents, Project Managers, and Employees/Sub-Contractors of Our Mechanical Contractors Who Will Be Involved With 
Field Installation of LG VRF Systems. 


TRAINING: LG’s Guidelines and Requirements for Installing Refrigerant Piping and Wiring Systems Connected To The Indoor and Outdoor LG VRF Air Conditioning Equipment.  The LG Training Session Begins With An Overview of The LG Multi V Product Line and Pertinent Installation Considerations. The Course Continues into Discussions on Refrigerant Piping Best Practices Including Proper Brazing and Flaring Practices, Pressure Testing, and Vacuum Procedure.  Also, Condensate Piping, Controls and Communication Wiring Installation Will Be Presented.  The Training Will Closeout with Discussions Covering LG LATS Piping Verification, Required Checklist/Documentation, and Pre-Commissioning Tasks That Must Be Completed Before Arranging Factory Authorized Startup and Commissioning Assistance.

LG TRAINING LAB EQUIPMENT & FEATURES:

Outdoor Units

MULTI V 5 with LGRED 

  • Heat Pump & Heat Recovery

  • (6-42 TR)

 MULTI V S with LGRED

  • Heat Pump & Heat Recovery

  • (3-4 TR)

MULTI V S 

  • Heat Pump (2-5 TR)

Split Compact DOAS 

Indoor Units 

•    Art Cool: Gallery -  Wall Mounted IDU
•    Art Cool: Mirror -  Wall Mounted IDU 
•    Ceiling Cassette: 1-Way, 2-Way, 4-Way (2'x2' & 3'x3')
•    Ceiling Suspended: Ceiling Mounted IDU 
•    Ceiling Concealed Duct: Low, Mid, & High Static
•    Vertical AHU: Vertical/Horizontal
•    Floor Standing: With Case

ATTENDANCE FEE: $150.00/Attendee  
CERTIFICATION: Upon Successful Completion of Online Exam, Each Student Will Receive a 2-Year LG Certification.


TRAINING DATES: Listed On Signup Page
LOCATION: Ward Mechanical Equipment

ADDRESS: 210 Market Ridge Drive , Ridgeland, MS 39157


CONTACT: Doug Aycock 
E-MAIL: Douga@wardmech.com 
PHONE: 601-956-3002 - EXT:238

LG LAB PHOTO GALLERY

bottom of page